- Situation: Ilam Province - 25th Km of Sarable-Ilam
road.
- Our Duties 1- Analyze
and Calculating the structures of the production line and
providing the construct plans of the structures. 2- The resident and sublime supervising.
- Construct
activities Concrete operations: 55000 m3
Reinforcing: 7000 ton
Steel operations:
about 4500 ton
- Description:
1- The Construction operating was from 2003-4-22 up to now.