- Situation: Gilan Province - 65th Km of Ghazvin-Rasht
road.
- Our Duties 1- Analyze
and Calculating the structures of the production line and
providing the construct plans of the structures. 2- The resident and sublime supervising.
- Construct
activities Concrete operations: 31000 m3
Reinforcing: 4500 ton
Steel operations:
about 4000 ton
- Description:
1- The Construction operating was from 2004-3-5 up to now.