- Situation: Kerman Province - 12th Km of Rafsanjan-Kerman
road.
- Our Duties 1- Analyze
and Calculating the structures of the production line and
providing the construct plans of the structures. 2- The resident and sublime supervising.
- Construct
activities Concrete operations: 78000 m3
Reinforcing: 10000 ton
Steel operations:
about 5000 ton
- Description:
1- The Construction operating was from 2004-9-25 up to now.