|
|
|
||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
2-Design and detailed engineering 3-Control project and supervision 4-Cost Studies and contract management _________________________________________________ 1- Administration
1-1 Chairman
1-2 Executive
board
_________________________________________________ 2- Design and Detailed Engineering The main duties of this section are: - Design of civil works includes basic layout of plant and architectural design of non-plant buildings. - Structural Engineering includes reinforced concrete and structural steel designs and working drawings for foundation and structures and prepares design/fabrication drawings. - Electrical, Mechanical Engineering include design for non-plant buildings. _________________________________________________ 3- Control Project and supervision This section is responsible for control and supervission of construction including integral planning i.e. progress, resources, finance and cost control. _________________________________________________ 4- Cost Studies and contract management. Valuate building and construction for different material and technologies from integral part of the projects costs. Furthermore, give a financial prospect to client for probable probable expenses in project to prepare required documents for contracts.
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||
|
|
|
|
|||||||||||||||||||||||||
|
|